EPC project in Talara refinery awarded to JJC

The project completion period is 730 calendar days.

Petroperu awarded JJC and Cosapi, through the JJC - Cosapi Consortium, in the form of a lump sum contract, the project for the construction of the administrative area of ​​the Talara refinery.

The scope includes administrative buildings and facilities, auxiliary buildings and facilities (sub-station and access booth). Laboratory: annexes and facilities, fitting of outdoor area, construction of the outdoor wastewater system and laboratory solid waste management system; and the dismantling, transportation, installation and/or assembly, calibration, certification and commissioning of the existing equipment to and at the new laboratory facilities.